

News information
News
Wiring process 3 minutes entry module wiring
- 分类:News information
- Release time:2022-03-04 16:44
【365平台】
Wiring process 3 minutes entry module wiring
【365平台】
- 分类:News information
- Release time:2022-03-04 16:44
- Visits:
1. Prepare for cable connection
1.1Tools required:
Needle nose pliers: folding line;
Wire stripper: Strip the wire skin,Prevent damage to copper core;
Size screwdriver:Turn the screw to hold down the copper core;
Water mouth pliers: cut the line;
套管&Casing printer: printing casing, marking the use of wire;
Cable tie: fixed wire;
Marker: To mark the wire;
1.2Fixed support
When using Madek electric box wiring, it is recommended to route cables from the rear, not from both sides.To ensure that the wiring is beautiful and not exposed。The support can be lifted to facilitate wiring。The bottom of the bracket is not suspended and supports the desktop。
2. Install terminals and modules
2.1Conventional electrical box layout
The first row of wiring terminals is put by default, and the second row of modules with less wiring is discharged in the third row and the fourth row in turn.
2.2The role of the terminal
In addition to connecting incoming and outgoing wires, terminals can also be used for grounding and zeroing.
3、接线
3.1Conventional wiring sequence
Connect from top to bottom, from the module with fewer wires to the module with more wires。Start at row three and end at row two。
3.2Polyline steps
Step 1: Straighten the wires;
Step 2: Use waste wire as a mold, first do the upper end wiring mold, and then do the lower end wiring mold, to ensure that each row of wiring is parallel;
The third step: Thread in left hand, needle nose pliers in right hand。After clamping the line with the pliers, press the line with the left thumb to fold the line into a right Angle。
3.3Cable label marking
The first step: according to the actual situation of the site to do casing such as:1-1,1-2,1-3;
The second step: the sleeve sleeve to the corresponding wire, complete the wire mark, convenient connection;
3.4Finish wiring
The exposed part of the surface should be kept neat and beautiful, and the thread on the back should be tied with cable ties.
4. Common problems
4.1Usually the bottom box is already buried, how do you go from the back?
The case and internal bracket of the Madek electric box are removable。
4.2How to fix the pipe at the bottom of the box?
Madek box bottom knock holes,A round knock hole is provided at the bottom of the Madek box. You can open the knock hole, install the connector and sleeve in the hole, and route the cable into the pipe for fixing。If the knock hole is not enough, you can also open additional holes yourself。
4.3What if I don't have enough null space?
If the guide rail is enough, the terminal block can also be used as a zero row, in addition, our box can also add its own zero row。
4.4The module port cables are all connected to the wiring bar. How to deal with the main inlet fire of the module port?
The live wire of the module can also be connected to the terminal block for centralized power supply。
4.5Wire with a few square?
According to the power of the scene to determine, the general lamp wire isBV1.5If there is a needBV2.5Can also。
Scan the QR code with your phone
Related reading
Related Reading
-
2022-09-23
Before the autumn equinox, most are non-years ? ----- I don't believe it either -
2022-09-14
I thought it was "she", but it was "he"!
-
2022-04-16
The most beautiful room! Voting link + rules update
-
2022-03-15
I heard that your computer room is very beautiful?
-
2022-03-04
Wiring process 3 minutes entry module wiring
Subscribe to our newsletter
Subscribe to our latest news
Related product recommendation
Premix equipment Pet material complete equipment aquatic pellet equipment silo storage equipment Livestock and poultry pellet equipment Biomass pellet machine Aquatic pellet equipment
Building 4, No.2 Jianye Road, Tianmuhu Industrial Park, Liyang City, Jiangsu Province
400-1686-950 matech@dr-casiano.com